Local Plan Part 2: Consultations on Modifications

Local Plans can be modified during the examination process, and we consult the public and key stakeholders on any proposed changes.

Following the conclusion of the examination hearings in early July 2025, the Inspector has issued the Council with his Post-Hearing Letter (ED042) (PDF), which identifies that the Plan, as submitted, is unsound - but could be made sound through proposed Main Modifications (MMs). 

The Inspector asked the Council to consult on a schedule of MMs based on those identified within his letter. 

In support of the consultation, the Council also published the following documents for information only: 

In accordance with the Government’s guidance, additional/minor modifications may be made by the Local Planning Authority where they do not materially affect the Plan’s policies.  The additional/minor modifications include items such as the correction of typos and updates to factual information.  Additional/minor modifications are not subject to the formal examination process. 

Representations on the Main Modifications

The Council received representations from 35 representors.  All representations received on the MMs are set out in the table below.  Each representor has been issued with a new ID number (MMR00x), which has been attributed chronologically based on the submission date. Where relevant, the representor’s ID number from the consultation held on the draft Submission version of the Local Plan in 2024 is also included in the title.

The Council have produced a spreadsheet of the responses received to the Main Modifications consultation and their response to the issues raised.

MM Representor IDRepresentorPrevious Representor ID
MMR001Elizabeth Homes Ltd (PDF)EA008
MMR002Kathy Unwin (PDF)ERL004
MMR003Canal and River Trust (PDF)SC015
MMR004Glenn Raymond (PDF) 
MMR005Natural England (PDF)SC010
MMR006Rosemary Langlands (PDF)ERL006
MMR007Prologis UK Ltd (PDF)EA019
MMR008Mike Chrimes / Costa Coffee Group (PDF)W303
MMR009National Grid Electricity Transmission (PDF)SC009
MMR010Woodland Trust (PDF) 
MMR011John Hugill (PDF)ERL003
MMR012Waltham Forest Civic Society (PDF)EG007
MMR013Edith Lobo (PDF) 
MMR014Greenberry Advisors (PDF) 
MMR015Thames Water (PDF)SC013
MMR016Ben Hobson PDF)W043
MMR017Allied Bakeries (PDF)EA002
MMR018Sherrygreen Homes (PDF)EA023
MMR019Transport for London (PDF)SC014
MMR020Waltham Forest Conservative Councillors Group (PDF)EG008
MMR021Rebecca Miles (PDF)ER135
MMR022Yolande Clerke (PDF) 
MMR023Matthew Thornton (PDF)W300
MMR024Wanis Ltd (PDF)EA029
MMR025Fusion Group (PDF) 
MMR026Tesco Group Ltd (R19004) (PDF)EA025
MMR026Tesco Group Ltd (R19008) (PDF)EA025
MMR027Mark Thomasson (PDF) 
MMR028Network Rail (PDF)SC011
MMR029London Borough of Hackney (PDF)SC005
MMR030NEAM Strategic Land UK Ltd (PDF)EA017
MMR031Lucy Hutchings (PDF) 
MMR032Kelvin Hui (PDF) 
MMR033Berkeley St Edward London (PDF)EA020
MMR034Environment Agency (PDF)SC002
MMR035Greater London Authority Land and Property (PDF)EA010

Next Steps

All representations received have been submitted to the Inspector for his consideration in preparing the final report.  The publication of the report concludes the examination process, and will set out the Inspector’s conclusions on the soundness and legal compliance of the report.  

Further information on the examination process is available in the Procedure Guide for Local Plan Examinations see Section 7: The Inspector’s report). If the Local Plan is found to be ‘sound’, it can be formally adopted by the Council. 

For any enquiries related to this consultation, please email: